Sapient x Casper - proposal workplan

Flexible delivery roadmap planner

A proposal-specific planning tool for the July-to-October workplan: drag work forward or back, resize scope, park work in the hopper, add stage gates, and tune capacity by changing load height.

Local draft

Proposal sequence map

Double click a lane to add a slug or stage gate. Drag slugs to move them, drag the ends to resize, or drop them into the hopper.

Vertical drag on a slug adjusts effort

Capacity load

The roadmap above drives timing. This view is only effort height: drag colored load pieces up or down to change effort.

Capacity line = full team
Workstream legend